This page contains press release content distributed by XPR Media. Members of the editorial and news staff of the USA TODAY Network were not involved in the creation of this content.

U.S. Data Center Construction Market to Reach USD 154.49 Billion Investment by 2031, Growing at 10.70% CAGR | Arizton

Expansion Led by Apple, Aligned Data Centers, AWS, CyrusOne, DataBank, and Digital Realty

Lithium-ion batteries, with higher energy density and longer lifecycle performance, are becoming the preferred choice for AI-driven facilities.”
— Ryan Turner

CHICAGO, IL, UNITED STATES, February 25, 2026 /EINPresswire.com/ — The U.S. data center construction market is entering a high-growth phase, driven by rapid expansion in artificial intelligence, cloud computing, and data-intensive digital services. Investment valued at USD 83.97 billion in 2025 and projected to reach USD 154.49 billion by 2031, the market is being reshaped by rising demand for high-density computing, advanced storage systems, and power-intensive infrastructure. As enterprises accelerate migration toward public and hybrid cloud platforms, developers are expanding capacity to support low-latency, high-performance workloads and evolving regulatory requirements. At the same time, elevated construction costs and power constraints are intensifying competition for cost-efficient, energy-secure locations, making strategic site selection a critical factor in long-term market growth.

Report Snapshot:
MARKET SIZE BY INVESTMENT (2031): USD 154.49 Billion
MARKET SIZE BY INVESTMENT (2025): USD 83.97 Billion
CAGR BY INVESTMENT (2025-2031): 10.70%
MARKET SIZE – AREA (2031): 52.57 Million Sq. Ft.
POWER CAPACITY (2031): 13,565 MW
HISTORIC YEAR: 2022-2024
BASE YEAR: 2025
FORECAST YEAR: 2026-2031
MARKET SEGMENTATION: Facility Type, Infrastructure, Electrical Infrastructure, Mechanical Infrastructure, Cooling Systems, Cooling Technique, General Construction, Tier Standards, and Geography

AI Is Reengineering the Future of Data Center Infrastructure
AI is transforming the landscape of the global data center market, as rising adoption across industries continues to drive the expansion of hyperscale facilities and high-density infrastructure. While current AI investments have not yet fully offset overall hyperscale growth, the capacity of data centers dedicated to AI workloads is expected to nearly triple over the next five to six years. As a result, new facilities are increasingly being designed to support high-performance, AI-optimized environments that can handle complex and compute-intensive applications. This shift toward AI-focused infrastructure is directly accelerating the adoption of GPUs across data centers worldwide. To meet the growing demand for faster model training, real-time inference, and improved energy efficiency, operators are deploying GPU-powered systems capable of massively parallel computing. These technologies are enabling scalable, high-density facilities that can support next-generation AI workloads while maintaining operational efficiency.

Advanced Cooling Is Emerging as a Critical Enabler of AI-Ready Data Centers
Advanced cooling solutions are becoming essential for modern data centers as AI, ML, and IoT workloads continue to drive higher power density and heat generation. To maintain performance, reliability, and energy efficiency, operators are increasingly adopting liquid cooling, hybrid thermal systems, and sustainable cooling technologies that support high-density, AI-ready infrastructure while reducing power and water consumption. This shift is being accelerated through partnerships between data center operators, cooling technology providers, and energy innovators. A key example is the USD 1.9 billion agreement between Switch and Schneider Electric in November 2025, highlighting how advanced cooling and collaborative innovation are becoming central to building scalable, efficient, and future-ready data center facilities.

Power Systems are Becoming the New Competitive Edge in U.S. Data Centers
The rapid expansion of high-density AI and cloud workloads in the U.S. is driving a fundamental shift in data center power infrastructure. As rack densities exceed 20 kW to 30 kW, operators are increasingly adopting advanced UPS systems, lithium-ion batteries, energy storage solutions, and low-emission generator technologies to maintain reliability and energy efficiency. Modern battery and power systems are evolving into strategic assets, enabling lower operating costs, faster commissioning, and improved grid interaction. Lithium-ion batteries, with higher energy density and longer lifecycle performance, are becoming the preferred choice for AI-driven facilities.
Reflecting this transition, Google has deployed more than 100 million lithium-ion cells across its global data center portfolio, leveraging a 48V DC rack-level power architecture with integrated Battery Backup Units (BBUs) to ensure uninterrupted, high-performance operations. Together, these developments highlight how advanced power infrastructure is now central to scalability, resilience, and long-term competitiveness in the U.S. data center construction market.

Access complete data tables and in-depth insights of market

The U.S. Data Center Construction Market Research Report Includes Size, Share, and Growth in Terms of
• Facility Type: Hyperscale Data Centers, Colocation Data Centers, and Enterprise Data Centers
• Infrastructure: Electrical Infrastructure, Mechanical Infrastructure, and General Construction
• Electrical Infrastructure: UPS Systems, Generators, Transfer Switches & Switchgears, PDUs, and Other Electrical Infrastructure
• Mechanical Infrastructure: Cooling Systems, Racks, and Other Mechanical Infrastructure
• Cooling System: CRAC & CRAH Units, Chillers Units, Cooling Towers, Condensers, and Dry Coolers, and Other Cooling Units
• Cooling Techniques: Air-based Cooling and Liquid-based Cooling
• General Construction: Core & Shell Development, Installation & Commissioning Services, Engineering & Building Design, Fire Detection & Suppression, Physical Security, and DCIM/BMS Solutions
• Tier Standards: Tier I & Tier II, Tier III, and Tier IV
• Regions: Southeastern U.S., Midwestern U.S., Southwestern U.S., Western U.S., and Northeastern U.S.

Key Data Center Support Infrastructure Providers
• ABB
• Caterpillar
• Cummins
• Delta Electronics
• Eaton
• Legrand
• Rolls-Royce
• Schneider Electric
• STULZ
• Vertiv
Other Data Center Support Infrastructure Providers
• Airedale
• Alfa Laval
• Asetek
• Bloom Energy
• Carrier
• Condair
• Cormant
• Cyber Power Systems
• Enlogic
• FNT Software
• Generac Power Systems
• Green Revolution Cooling (GRC)
• HIMOINSA (Yanmar)
• HITEC Power Protection
• Johnson Controls
• KOHLER (Rehlko)
• KyotoCooling
• Mitsubishi Electric
• Natron Energy
• NetZoom
• Nlyte Software
• Rittal
• Siemens
• Trane
• ZincFive
Key Data Center Construction Contractors
• AECOM
• Ames Construction
• Arup
• Barge Design Solutions
• Burns & McDonnell
• Corgan
• DPR Construction
• Fortis Construction
• Haydon
• Holder Construction
• Jacobs
• KDC
• Kiewit Corporation
• Lewis Michael Consultants
• Morgan Construction
• Morgan Corp
• Page
• Rogers-O’Brien Construction
• Rosendin Electric
• Syska Hennessy Group
• Turner Construction
Other Data Center Construction Contractors
• AlfaTech
• Aplena
• Black & Veatch
• BlueScope Construction
• Brasfield & Gorrie
• CallisonRTKL
• Clark Construction Group
• Clayco
• Climatec
• Clune Construction
• EMCOR Group
• EYP MCF
• Fitzpatrick Architects
• Fluor Corporation
• Gensler
• Gilbane Building Company
• Gray
• HDR
• Hensel Phelps
• HITT Contracting
• Hoffman Construction
• JE Dunn Construction
• JHET Architects,
• JTM Construction Group
• kW Engineering
• Linesight
• M+W Group (Exyte)
• McCarthy Building Companies
• Morrison Hershfield
• Mortenson
• Pepper Construction
• Rosendin
• Ryan Companies
• Salute Mission Critical
• Sheehan Nagle Hartray Architects
• Skanska
• Southland Industries
• STO Building Group
• Sturgeon Electric Company
• Suffolk Construction
• Sundt Construction
• The Mulhern Group
• The Walsh Group
• The Weitz Company
• The Whiting-Turner Contracting Co.
• TRINITY Group Construction
• Walbridge
• WSP
Key Data Center Investors
• Apple
• Applied Digital
• AWS
• CyrusOne
• DataBank
• Digital Realty
• Equinix
• Google
• Meta
• Microsoft
• NTT DATA
• Vantage Data Centers
Other Data Center Investors
• AAIM Data Centers
• Aligned Data Centers
• American Tower
• Aubix
• Centersquare
• CloudHQ
• Cologix
• Compass Datacenters
• COPT Data Center Solutions
• Core Scientific
• Centra
• Crusoe
• DartPoints
• DC BLOX
• DigiPowerX (DigiHost)
• EdgeConneX
• EdgeCore Digital Infrastructure
• Element Critical
• FifteenFortySeven Critical Systems Realty (1547)
• Flexential
• H5 Data Centers
• HostDime
• Hut 8
• Iron Mountain
• Netrality Data Centers
• Novva Data Centers
• PhoenixNAP
• PowerHouse Data Centers
• Prime Data Centers
• QTS Realty Trust
• Sabey Data Centers
• Skybox Datacenters
• STACK Infrastructure
• Stream Data Centers
• Switch
• T5 Data Centers
• TierPoint
• WhiteFiber
• Yondr
• 365 Data Centers
• 5C Data Centers
• New Entrants
• Ada Infrastructure
• Ardent Data Centers
• Beale infrastructure
• Big Sky Digital Infrastructure
• CleanArc Data Centers
• CloudBurst Data Centers,
• Colovore
• Crane Data Centers
• Edged Energy
• Fleet Data centers
• Lambda
• LightHouse Data Centers
• Metroblocks
• NE Edge
• Penzance
• Prometheus Hyperscale
• Quantum Loophole
• RadiusDC
• Related digital
• Rowan Digital Infrastructure
• Sailfish Investors
• Tract

Discover Connected Market Opportunities:
U.S. Data Center Colocation Market – Industry Outlook & Forecast 2025-2030
https://www.arizton.com/market-reports/us-data-center-colocation-market
Global Data Center Construction Market Landscape 2025-2030
https://www.arizton.com/market-reports/data-center-construction-market-investment-forecast

What Key Findings Will Our Research Analysis Reveal?
• How big is the U.S. data center construction market?
• What is the estimated market size in terms of area in the U.S. data center construction market by 2031?
• What is the growth rate of the U.S. data center construction market?
• What are the key trends in the U.S. data center construction market?
• How many MW of power capacity is expected to reach the U.S. data center construction market by 2031?

Why Arizton?
100% Customer Satisfaction
24×7 availability – we are always there when you need us
200+ Fortune 500 Companies trust Arizton’s report
80% of our reports are exclusive and first in the industry
100% more data and analysis
1500+ reports published till date

Post-Purchase Benefit
• 1hr of free analyst discussion
• 10% off on customization

About Us:
Founded in 2017, Arizton Advisory & Intelligence delivers data-driven market research and strategic consulting that empowers clients to make informed decisions and drive growth. Combining quantitative and qualitative insights, we provide in-depth analysis across industries including Agriculture, Consumer Goods, Technology, Automotive, Healthcare, Data Centers, and Logistics. Recognized by top-tier media, our expert team transforms complex market data into actionable strategies, helping clients anticipate trends, seize opportunities, and stay ahead of the competition.

Jessica
Arizton Advisory & Intelligence
+1 312-680-2940
jessica@arizton.com
Visit us on social media:
LinkedIn
Facebook
X

Legal Disclaimer:

EIN Presswire provides this news content “as is” without warranty of any kind. We do not accept any responsibility or liability
for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this
article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Information contained on this page is provided by an independent third-party content provider. XPRMedia and this Site make no warranties or representations in connection therewith. If you are affiliated with this page and would like it removed please contact pressreleases@xpr.media

Rewarx Launches Prompt-Free AI Platform to Automate 4K E-Commerce Product Photography

Rewarx Launches Prompt-Free AI Platform to Automate 4K E-Commerce Product Photography

Featuring a prompt-free interface, the platform generates 4K product images from everyday snapshots to streamline

March 1, 2026

How Strategic Land Assembly Is Reshaping Canada’s Urban Development Landscape

How Strategic Land Assembly Is Reshaping Canada’s Urban Development Landscape

TORONTO, ONTARIO / ACCESS Newswire / March 1, 2026 / As Canadian cities grapple with intensifying housing shortages,

March 1, 2026

Elizabeth Dipp Metzger Achieves Top of the Table Honors with Million Dollar Round Table (MDRT)

Elizabeth Dipp Metzger Achieves Top of the Table Honors with Million Dollar Round Table (MDRT)

Helping our clients navigate complexity, protect their families, and plan with purpose—that’s what drives our team.”—

March 1, 2026

Studycat’s Fun Kids Language App Helps Families Choose Better Screen Time

Studycat’s Fun Kids Language App Helps Families Choose Better Screen Time

Studycat helps families turn children’s screen time into language learning through play-based apps designed for early

March 1, 2026

During National Consumer Protection Week, Buyers Brokers Only Educates Homebuyers on Dual Agency Risks

During National Consumer Protection Week, Buyers Brokers Only Educates Homebuyers on Dual Agency Risks

Poll data shows most home buyers do not fully understand dual agency; an exclusive buyer agent firm urges consumers to

March 1, 2026

WebDaddy Pro Launches WebsitesDoneForYou.com, Offering Free $3,500+ Websites to 100 Rio Grande Valley Businesses

WebDaddy Pro Launches WebsitesDoneForYou.com, Offering Free $3,500+ Websites to 100 Rio Grande Valley Businesses

WebDaddy Pro launches WebsitesDoneForYou.com with a free $3,500 website offer for the first 100 Rio Grande Valley

March 1, 2026

Former Pro Racer Can Akkaya Launches New Book ‘Mind Over Machine,’ Fixing Psychological Barriers in Motorcycle Riding

Former Pro Racer Can Akkaya Launches New Book ‘Mind Over Machine,’ Fixing Psychological Barriers in Motorcycle Riding

Pro racer Can Akkaya fixes the mental barriers of street and track riding, offering a roadmap to overcome fear and ego

March 1, 2026

Eridan Introduces 4T4R Radio at MWC, Integrated with NVIDIA AI-RAN

Eridan Introduces 4T4R Radio at MWC, Integrated with NVIDIA AI-RAN

High-capacity Ultra-Clean Signal™ platform for AI-orchestrated and distributed RAN As the industry moves toward AI-RAN

March 1, 2026

Dr. Kimbro-Hamilton Leads Black History Month with Citywide Presentations on Nashville’s Negro League Legacy

Dr. Kimbro-Hamilton Leads Black History Month with Citywide Presentations on Nashville’s Negro League Legacy

For Black History Month, educator, author, and film director, Dr. Hamilton shares Nashville’s often-overlooked history

March 1, 2026

Dr. Burkhard’s new book is a practical guide for coaches, leaders, and professionals who want to sharpen their skills

Dr. Burkhard’s new book is a practical guide for coaches, leaders, and professionals who want to sharpen their skills

Dr. Burkhard's book 50 Questions to be more Impactful Coach is a practical guide for coaches, leaders, and

March 1, 2026

Etavele Solutions, Nonprofit Consulting Firm, Announces Expansion with New Midwest Location

Etavele Solutions, Nonprofit Consulting Firm, Announces Expansion with New Midwest Location

Etavele Solutions Midwest opens offering nonprofit consulting using trademarked "C.A.M.P" program, fundraising

March 1, 2026

Key Housing Announces Living at NoHo in North Hollywood as March’s Featured Southern California Listing

Key Housing Announces Living at NoHo in North Hollywood as March’s Featured Southern California Listing

Key Housing names Living at NoHo in Los Angeles its Featured Southern California Listing for March 2026, highlighting

March 1, 2026

ATRIMED’s Women-Led Team Converts Ancient Sanskrit Medical Texts into AI-Searchable Data for In-Silico Discovery

ATRIMED’s Women-Led Team Converts Ancient Sanskrit Medical Texts into AI-Searchable Data for In-Silico Discovery

BANGALORE, INDIA, February 26, 2026 /EINPresswire.com/ — ATRIMED, a research-driven life sciences company specializing

March 1, 2026

TRIMED’s Women-Led Team Converts Ancient Sanskrit Medical Texts into AI-Searchable Data for In-Silico Discovery

TRIMED’s Women-Led Team Converts Ancient Sanskrit Medical Texts into AI-Searchable Data for In-Silico Discovery

BANGALORE, INDIA, February 26, 2026 /EINPresswire.com/ — ATRIMED, a research-driven life sciences company specializing

March 1, 2026

RBmedia Brings the Books Behind Three Oscar Best Picture Nominees to Life in Audio

RBmedia Brings the Books Behind Three Oscar Best Picture Nominees to Life in Audio

These nominations demonstrate that books remain the original source of intellectual property in the entertainment

March 1, 2026

Ampler Celebrates 10 Years of Building the All-in-One Microsoft Office Productivity Suite for Consultants

Ampler Celebrates 10 Years of Building the All-in-One Microsoft Office Productivity Suite for Consultants

Founded by former Bain consultants, Ampler has over the last 10 years evolved into a single Office Productivity Add-in

March 1, 2026

Cancun All Inclusive is ready for Spring Break 2026 with new Resorts, Exclusive Deals, activities and more!

Cancun All Inclusive is ready for Spring Break 2026 with new Resorts, Exclusive Deals, activities and more!

Ready for Spring Break? Cancun All Inclusive has everything you need. All Inclusive Resorts, Airport Transportation,

March 1, 2026

TTW Reveals 50 Best Nightlife Travel Destinations in the Americas and Caribbean for 2026

TTW Reveals 50 Best Nightlife Travel Destinations in the Americas and Caribbean for 2026

TTW Reveals 50 Best Nightlife Travel Destinations in the Americas and Caribbean for 2026 Nightlife tourism is driving

February 28, 2026

Classical Music: Guardian of Health – EAMA Students Perform at NIH, St. Jude, and Leading Hospitals Nationwide

Classical Music: Guardian of Health – EAMA Students Perform at NIH, St. Jude, and Leading Hospitals Nationwide

Dr. Oster’s “Classical Music: Guardian of Health” initiative brings the healing power of piano performance to patients,

February 28, 2026

Nomadic Aviation Group Debuts ‘Cockpit Casual: The Podcast’

Nomadic Aviation Group Debuts ‘Cockpit Casual: The Podcast’

A weekly deep dive into commercial airliner delivery, international flight operations, and the business forces shaping

February 28, 2026

Mariben Christine Tan Eustaquio, Founder of EZONE, Discusses Entrepreneurial Insights and Business Growth

Mariben Christine Tan Eustaquio, Founder of EZONE, Discusses Entrepreneurial Insights and Business Growth

DUBAI, DUBAI, UNITED ARAB EMIRATES, February 28, 2026 /EINPresswire.com/ — Xraised is excited to present an exclusive

February 28, 2026

Dreamers & Lovers Expands California Bridal Atelier Focused on Handmade Wedding Dresses Made in LA

Dreamers & Lovers Expands California Bridal Atelier Focused on Handmade Wedding Dresses Made in LA

In an industry built on mass production, one California bridal atelier still makes every wedding dress by hand, 13

February 28, 2026

San Bernardino Emerges as One of the Most Affordable Cities in Southern California

San Bernardino Emerges as One of the Most Affordable Cities in Southern California

SAN BERNARDINO, CA, UNITED STATES, February 28, 2026 /EINPresswire.com/ — The City of San Bernardino is one of the

February 28, 2026

Kapil Matta, DigitalXForce Middle East Region Lead, elected as President of ISACA UAE Chapter

Kapil Matta, DigitalXForce Middle East Region Lead, elected as President of ISACA UAE Chapter

Kapil Matta, DigitalXForce Middle East Region Lead, elected as President of ISACA UAE – A Proud Milestone for

February 28, 2026

Robert Paul Kersbergen Launches New Growth Architecture Platform to Redefine Fractional CMO Services

Robert Paul Kersbergen Launches New Growth Architecture Platform to Redefine Fractional CMO Services

Robert Paul Kersbergen Launches New Growth Architecture Platform to Redefine Fractional CMO Services Most consultants

February 28, 2026

Café 86 SA Appoints Amira Abdelkader, RN, to Board of Directors and Expands Community Wellness Programming

Café 86 SA Appoints Amira Abdelkader, RN, to Board of Directors and Expands Community Wellness Programming

Café86SA strengthens community mental health initiatives as veteran healthcare leader Amira Abdelkader joins Board of

February 28, 2026

US National Steel Announces Expanded Project Management Framework

US National Steel Announces Expanded Project Management Framework

to Improve Code Compliance and Client Transparency in Steel Building Construction STUART, FL, UNITED STATES, February

February 28, 2026

Aquaponics USA Poised To Enhance Arizona CTE Programs

Aquaponics USA Poised To Enhance Arizona CTE Programs

Aquaponics USA is scheduling sit-down Meetings with Arizona School District Superintendents to encourage them to add

February 28, 2026

Food Journal Magazine Raises the Standard for Restaurant Reviews in Los Angeles

Food Journal Magazine Raises the Standard for Restaurant Reviews in Los Angeles

Where Culinary Expertise Meets Editorial Excellence: Food Journal Magazine Provides Expert Reviews and Curated Guides

February 28, 2026

Guaranteed Auto Sales in Johnston Expands Focus on Flexible Financing for Rhode Island Drivers

Guaranteed Auto Sales in Johnston Expands Focus on Flexible Financing for Rhode Island Drivers

A Rhode Island dealership focused on transparent pricing, quality inventory, and straightforward financing for everyday

February 28, 2026

Beyond Ride and Always Best Care Point Toward Stronger, More Coordinated Support for Seniors in Tacoma

Beyond Ride and Always Best Care Point Toward Stronger, More Coordinated Support for Seniors in Tacoma

When caregiving and medical transportation align, senior care becomes calmer and more reliable. A quiet moment in

February 28, 2026

VideoPlus.ai Launches Redesigned Website to Bring AI Powered Video Creation to Global Audience

VideoPlus.ai Launches Redesigned Website to Bring AI Powered Video Creation to Global Audience

The refreshed platform delivers a faster, more intuitive experience for creators and marketing teams worldwide –

February 28, 2026

NashikKumbhMela.org Launches Comprehensive Digital Travel Guide and Pilgrim Portal for the 2027 Simhastha Kumbh Mela

NashikKumbhMela.org Launches Comprehensive Digital Travel Guide and Pilgrim Portal for the 2027 Simhastha Kumbh Mela

New portal provides official 2027 Shahi Snan dates, crowd forecasting, and complete Yatra guides for devotees attending

February 28, 2026

Planning for Two Lifetimes™ Highlights Financial Challenges Facing U.S. Families Raising Children with Disabilities

Planning for Two Lifetimes™ Highlights Financial Challenges Facing U.S. Families Raising Children with Disabilities

Financial Specialist Michael Ringel Calls Attention to Overlooked Risks That Threaten Lifelong Stability NEW YORK, NY,

February 28, 2026

Pocfarmer Invests US$8 Million to Accelerate Modernization of Michoacán’s Blackberry Sector

Pocfarmer Invests US$8 Million to Accelerate Modernization of Michoacán’s Blackberry Sector

Investment to enhance agricultural financing, modern farming technology, and global market access for one of the

February 28, 2026

5 Criteria for Selecting the Best Used Dump Truck For Sale in the 2026 Global Market

5 Criteria for Selecting the Best Used Dump Truck For Sale in the 2026 Global Market

JINING, SHANDONG, CHINA, March 1, 2026 /EINPresswire.com/ — The year 2026 marks a pivotal era for global

February 28, 2026

Analytical Report: Performance and Demand for Heavy Duty HOWO Dump Truck In China Across Africa and Southeast Asia

Analytical Report: Performance and Demand for Heavy Duty HOWO Dump Truck In China Across Africa and Southeast Asia

JINING, SHANDONG, CHINA, March 1, 2026 /EINPresswire.com/ — The global construction and mining sectors are witnessing

February 28, 2026

MBEP Commemorates Black History Month by Celebrating People and Programs that Uplift the Tri-County Region

MBEP Commemorates Black History Month by Celebrating People and Programs that Uplift the Tri-County Region

The Monterey Bay Economic Partnership amplifies the work of Black leaders across Monterey, Santa Cruz, and San Benito.

February 28, 2026

PitPat Launches ‘Spring Forward Ride’ — A Mileage-Driven Cycling Incentive Event Redefining the Value of Digital Sports

PitPat Launches ‘Spring Forward Ride’ — A Mileage-Driven Cycling Incentive Event Redefining the Value of Digital Sports

HOUSTON, TX, UNITED STATES, February 28, 2026 /EINPresswire.com/ — As a global leader in online competitive events,

February 28, 2026

Anchorage’s Art Investment Fund: Leading the way in transforming art into a regulated, high-performance asset class

Anchorage’s Art Investment Fund: Leading the way in transforming art into a regulated, high-performance asset class

MONTE CARLO, MONACO, February 28, 2026 /EINPresswire.com/ — In the luxurious ambience of the Fairmont Hotel Monte

February 28, 2026